[Schematic] Silicon Factory (oil version)
Views: 802
1
Input water at the top and bottom conduits and input oil in the middle conduit.
This schematic uses pneumatic drills to get sand, which means it needs to be put on top of sand.
Output of silicon comes from the bottom bridge.
Requirements:
Water: 7.2/s per module
Oil: 6/s per module
*The drills need to be placed on sand
I would appreciate any suggestions on how to make this design better
8170359234
-72