[Schematic] Backup Power Storage.

Views: 1128
schematic preview
1

connect your main power grid to the top power node, and connect all auxilary/backup power to the bottom node. make sure they don't mix. if consumption is lower than production, the battery will charge. if consumption in higher than production, the auxilary circuit will activate and release the backup power.

filter is red: using backup ec
filter flashing red and greed: charging auxilary power
filter is green: fully charged

copper149lead418metaglass70graphite5titanium20silicon140plastanium10