[Schematic] 12 clog-proof electrolyzers

Views: 544
schematic preview
0

Can be stacked up to six times.

Bridge conduits must be added at both ends after stacking to bring hydrogen and ozone together.

This is clog-proof during rebuilds and independently of build order.

Input:
• 120 water/s

Output:
• 48 ozone/s
• 72 hydrogen/s

graphite734silicon600beryllium2133tungsten970
negative power icon-720